Plastered Finish
The lowest row of tiles will be installed with mortar and plastered neatly with the wall. This technique is used if the construction is been done without horizontal rafters.
To prevent rain water dropping between roof and roof tiles the first row of tiles will be installed with mortar. A concrete wedge will be installed above the first row towards the roof. This wedge will guide water away from below the roof to the first row of tiles. It guarantees a dry roof for ever.
Before installing the roof tiles the concrete wedge will be also sealed.